- Home
- Industries We Serve
- Education Facility Roofing in Las Cruces, NM

NMSU, Doña Ana Community College, and Las Cruces Public Schools all run flat and low-slope roofs over gyms, cafeterias, labs, and administration wings that can't sit empty for a reroof. We plan around the academic calendar so tear-off and membrane work happens when buildings are light on people, not during finals week or the first month of fall semester.
Winter break gives us roughly three weeks on a K-12 campus, summer break gives us three months on higher-ed buildings, and neither window is long enough to waste on mobilization delays. Before a break starts we've already got the tear-off sequence, dry-in plan, and inspection points worked out with the facilities director so crews hit the roof on day one instead of week two.
Occupied-wing work during the school year is a different job entirely. We isolate work zones, control roof-top unit noise during class hours, and stage material hoists away from bus loops and pickup lines. A gym roof over a basketball court in session gets treated differently than an empty warehouse - foot traffic below changes how we sequence hot work and where we can stage kettles or hot-air welders.
Gymnasiums, auditoriums, and cafeterias at NMSU and around the district have some of the widest unsupported spans on any local building type, which means more roof deflection, more ponding risk at low points, and membrane systems that need to handle movement without splitting at the seams. TPO and modified bitumen both work here, but drainage design matters more than membrane brand on a roof this size.
We look hard at the tapered insulation and existing drain layout before recommending a system on these buildings. A recover over a gym roof with marginal drainage just locks in the ponding problem under a new membrane - sometimes the right call is adding crickets or reworking a scupper before the new roof goes down, not after.
Fire-rated assemblies, smoke vent penetrations, and rooftop equipment tied to life-safety systems all carry extra documentation requirements on school and campus buildings. We coordinate roof penetrations with the district's or university's fire marshal sign-off before we cut anything, and we keep photo documentation of every curb, vent, and roof hatch we touch.
Energy code compliance is its own layer on public education work - insulation R-values and cool-roof reflectivity requirements get checked against the current New Mexico energy code, not whatever was standard when the building went up. That matters for bond-funded projects where the specification has to pass a plan review before work starts.
Public school roof replacement in New Mexico typically rides on a general obligation bond or a Public School Facilities Authority allocation, which means the money, the scope, and the timeline get locked well before a crew shows up. We work with facilities directors during the planning phase to build a roof condition assessment that supports the funding request, not only a bid submitted after the money's already approved.
Higher-ed capital planning at NMSU runs on a different clock than K-12 bonds, often tied to deferred-maintenance backlogs and departmental budget cycles, but the same principle holds: a roof survey that speaks the language of the funding process gets projects approved faster than a generic bid.
Every campus and district facilities team has its own approval chain, contractor vetting process, and safety orientation requirements before crews can badge in. We handle that intake work up front rather than treating it as a delay - background checks, safety training modules, and site orientation get scheduled before mobilization, not discovered on day one.
We also report back in the format facilities directors actually use: photo logs, moisture scan results, and warranty documentation that can get filed with the district or university and pulled up years later when a leak call comes in on a roof someone else remembers installing.
On most gym and cafeteria roofs, yes, if the scope is a single membrane system without major structural work. We build the schedule backward from the first day of fall semester so there's buffer for weather delays, not a schedule that assumes perfect conditions every day.
Older NMSU and district buildings sometimes have roofing materials that need abatement before tear-off starts. We flag this during the initial roof survey so it gets scoped and budgeted with the district's environmental consultant well before demolition, not discovered mid-project.
Yes. Rooftop units serving occupied classrooms or labs stay running during our work unless a shutdown is scheduled and coordinated with facilities. We build curb flashing sequences around live equipment rather than asking a district to shut down cooling in August.
Photo-documented roof condition surveys, itemized scope of work, and warranty paperwork formatted to support capital planning submissions. We've built these packages for facilities directors who need to justify funding requests, not only close out a project.
Yes, and that's usually the smarter first step. A roof survey can show whether a section needs full replacement or whether targeted repair and a coating buy several more years - information worth having before a bond request goes to the board.